Blackwater’s New Health Hub Project

Blackwater’s New Health Hub Screw Pile Installation Project

Location: 41 MacKenzie Street, Blackwater , QLD

Job Type: Commercial

Project Duration: 2 April 2024 to 11 April 2024

Project Overview

As part of Queensland Health’s $14 billion Big Build program, the new Blackwater Multipurpose Health Service was designed to consolidate emergency, inpatient, aged care, and outpatient services under one roof. This modern facility replaces the town’s 50-year-old hospital and expands capacity for both acute and long-term care.

Blade Pile was engaged by Hutchies Modular to support the project’s structural works with a tailored, high-performance piling solution suited to the project’s geotechnical and scheduling demands.

Challenge: Fast-Track Delivery, Remote Site, Variable Soils

Building a modern health facility in a regional setting presents distinct engineering and logistical challenges. The Blackwater site required a high-load foundation system capable of supporting a large, multi-zoned structure across a broad footprint.

With limited access to specialised equipment, fluctuating soil conditions, and a need to maintain a tight schedule ahead of the facility’s staged handover, the foundation scope demanded speed, accuracy, and flexibility. Each pile had to be installed to exact depth and torque specifications, complying with stringent load requirements.

 

Our Implementation: High-Strength Screw Piles, Installed with Efficiency

To meet the structural demands, Blade Pile supplied and installed over 275 galvanised 2.0M Blade Piles (114.3 × 6mm shaft with 250 × 8mm blades), with 2.0M extensions, to achieve the required design depths and load capacity.

Our screw piles offered:

  • Rapid, low-disruption installation without pre-excavation
  • High axial and lateral load capacity suitable for complex mixed-use builds
  • Galvanised protection for long-term durability in regional conditions

Working closely with the construction team, Blade Pile completed the full installation within the 9-day window, meeting all engineering specifications and site constraints.

Blackwater New Health Screw Pile Installation Project

Project Outcome: On-Schedule Delivery, Zero Compromises

As a leading piling company in Australia, Blade Pile’s screw pile system provided a precise, engineered foundation that integrated seamlessly with the Blackwater Modular Hospital Redevelopment schedule. Every pile was installed with full torque monitoring to validate capacity in real time, reducing rework and ensuring consistency across zones.

This project highlights the value of screw pile technology in regional health infrastructure: adaptable, fast to deploy, and reliable under pressure. With the facility now operational, Blade Pile’s contribution forms the groundwork for ongoing healthcare delivery for the Blackwater community.

Explore more regional success stories. Visit our pile insights page to learn how Blade Pile supports critical infrastructure projects across Australia.

Screw Pile Installation
0 +
Days Without Delays
0

Contact

Connect with us

Map of locations in Australia and New Zealand
Map of locations in Australia and New Zealand

Learn more about our custom piling process and pricing by getting in touch with our team today.