Moranbah Hospital Screw Pile Installation Project

Moranbah Modular Hospital Screw Pile Installation Project

Location: 142 Mills Avenue, Moranbah, QLD

Job Type: Commercial

Project Duration: 29 January 2024 to 9 February 2024

Project Overview

Blade Pile was engaged to support early works for the construction of the new $48.5 million Moranbah Hospital – a major regional health facility funded by the Queensland Government and delivered by Hutchinson Builders. The project will significantly expand emergency and outpatient care across the Bowen Basin, requiring a structural foundation that performs under pressure.

Our scope included the supply and installation of over 560 galvanised screw piles to establish a stable, code-compliant foundation in preparation for vertical construction.

Challenge: Precision Under Pressure

The Moranbah site presented two main complexities:

  • Access & Logistics: Located deep in Queensland’s resource corridor, the site required coordinated delivery of piling equipment and materials within tight timeframes.
  • Geotechnical Demands: The soil profile required a solution that could accommodate load variability, maintain site integrity, and meet performance requirements without compromise.

With a narrow 12-day installation window and no room for error in placement or depth, both planning and on-site execution had to be accurate.

Our Implementation: Engineered Screw Piles for Reliable Ground Support

The Blade Pile team supplied and installed

  • Galvanised 3.0M Blade Pile 76×4mm shafts with
  • 250×8mm twin blades, specifically engineered for the geotechnical conditions of the Moranbah site.

We deployed experienced operators, high-capacity torque drivers, and GPS-aligned equipment to ensure accurate placement and consistent penetration depths and minimal soil disturbance.

All screw piles were manufactured to comply with AS 2159 and installed by trained operators following certified procedures.

By using screw piling foundations, we eliminated concrete curing delays and reduced environmental disruption, ensuring a fast, clean, and structurally sound result.

Project Outcome: Delivered to Spec, On Time, No Delays

  • Over 560 screw piles installed to specification with full compliance and zero rework
  • Completed in 12 days with no delays despite the remote site access
  • Hutchinson Builders was highly satisfied with both the professionalism and the quality of the outcome
  • The installed piles now provide a solid foundation for the Moranbah Hospital, designed to support 24-hour care, medical imaging, and emergency services
Screw Pile Installation
0 +
Days Without Delays
0

A Reliable Foundation for Future-Ready Infrastructure

This installation demonstrates how engineered screw pile systems can overcome regional access challenges without compromising performance or project momentum.

As a leading piling company in Australia, our expertise enabled efficient construction staging in a challenging location while ensuring compliance, speed, and long-term performance – a vital step in supporting essential healthcare infrastructure for regional Queensland. Speak with one of our geotechnical specialists about your site conditions and foundation challenges.

Contact

Connect with us

Map of locations in Australia and New Zealand
Map of locations in Australia and New Zealand

Learn more about our custom piling process and pricing by getting in touch with our team today.